Jump to content

Bryan Longa

Members
  • Posts

    5
  • Joined

  • Last visited

Posts posted by Bryan Longa

  1. I've been trying to replicate the following scenario but so far have been unsuccesful, could you help me replicate it in a video capture so I can understand it?
    The scenario (related to https://allmoxy.atlassian.net/browse/DEV-2328) is:

    To replicate the issue:

    • Create new job in designer

    • Choose shaker door and drawer fronts and a solid wood face material

    • Put a few cabinets in the room. At least one door and one drawer front.

    • Send to MRP with the next button.

    • Save job

    • Go back to design view of that job and change doors and drawer fronts to decorative slab with a corresponding material.

    • At this point, only the drawer faces will change, doors will stay shaker. Materials will change for both drawer faces and doors.

    • Going to MRP will show the same and give validation errors for door style / materials that don't work together on doors.

    I don't understand what a shaker door or a drawer front exactly means and how can I work on this.

×
×
  • Create New...

Important Information

Terms and conditions of this site